10-Point Roofing Proposal Review Checklist

10-Point Roofing Proposal Review Checklist

A roofing proposal can look complete and still leave out the work that prevents leaks later. A low total may not include flashing, damaged decking, ventilation corrections, permit costs, or the cleanup needed to protect your property. Use this roofing proposal review checklist before you sign so you can compare what each contractor is actually promising to install.

For homeowners and property managers in Baytown and across East Texas, this matters most after a storm or active leak. The roof may need urgent attention, but urgency should not require guesswork. A clear proposal should show what was found, what will be repaired or replaced, which materials will be used, and who is responsible for each part of the job.

Start With the Evidence Behind the Proposal

Before reviewing price, ask what the contractor observed on the roof. A proposal should be based on an actual evaluation, not a quick view from the driveway or a satellite image alone. That is especially true after wind, hail, or a recurring leak.

Request photos and plain-language notes showing the condition of the shingles or roof membrane, flashing, penetrations, valleys, ridge areas, drainage components, and any visible decking concerns. On a commercial roof, the evaluation should also address seams, drains, curbs, ponding water, edge metal, and areas where equipment or foot traffic may affect the system.

Evidence does not mean a contractor must predict every hidden condition before work begins. Decking beneath an old roof cannot always be fully evaluated until the existing material is removed. The proposal should simply explain that possibility and state how concealed damage will be documented, approved, and priced if it is found.

Roofing Proposal Review Checklist: 10 Items to Verify

1. The property and roof areas are identified correctly

The proposal should name the property address and specify which roof sections are included. If a detached garage, patio cover, low-slope section, or commercial addition is excluded, it should say so. Vague wording such as “replace roof” creates room for disagreement when the building has more than one roof type or elevation.

Confirm whether the stated quantity is based on roof squares, square feet, linear feet, or another measurement. Measurements do not need to match competing proposals exactly, but a large difference deserves an explanation.

2. The scope separates replacement work from repairs

A repair proposal should identify the suspected leak area, the materials to be removed, the repair method, and the limits of the repair. It should not be presented as a permanent solution if surrounding materials are at the end of their useful life.

A replacement proposal should state whether the old roof will be torn off, how many layers are being removed, and what happens to the debris. If the contractor is proposing an overlay, ask why it is appropriate and whether local code, existing roof layers, decking condition, or manufacturer requirements affect that choice.

3. Materials are named, not described loosely

“Architectural shingles” is not enough information for a meaningful comparison. The proposal should identify the manufacturer, product line, color, and performance class when applicable. For impact-resistant shingles, verify the stated impact rating. For metal, tile, TPO, or other low-slope systems, look for the panel or membrane type, thickness or gauge where relevant, attachment method, and insulation or underlayment details.

Material substitutions sometimes become necessary because of availability. That can be reasonable, but the agreement should require your approval for a change that affects appearance, performance, or price.

4. Underlayment, flashing, and penetrations are included

Most roof failures begin at transitions, not in the center of a field of shingles. Review the proposal for underlayment, starter materials, ridge cap, pipe boots, wall flashing, valley treatment, chimney flashing, drip edge, and ventilation components.

For a flat or commercial roof, the same principle applies. The proposal should identify work at drains, scuppers, parapet walls, curb flashing, pipe penetrations, seams, and edge details. If an item is excluded because it appears serviceable, ask how that determination was made.

5. Decking and structural conditions have a clear process

A roofing contractor should not promise that no decking will need replacement before the old roof is removed. What you need is a documented process. The proposal should state the unit price for approved decking replacement or explain how pricing will be handled.

Ask whether photos will be provided before any added work begins. For commercial buildings, also clarify whether there are known structural limitations, wet insulation concerns, or areas that need a separate engineering review.

6. Ventilation and drainage are addressed when needed

A new roof installed over poor attic ventilation can still experience heat buildup, moisture issues, and shortened material life. The proposal should say whether existing intake and exhaust ventilation will remain, be improved, or be evaluated separately.

Drainage deserves the same attention on low-slope roofs. Ponding water, undersized drains, clogged scuppers, or improper slope may be outside a basic roof-covering scope, but they should not be ignored. If the proposal does not address a visible drainage issue, ask whether it is excluded or whether another corrective option is available.

7. Price includes the full job, not just the roof covering

Compare proposals line by line rather than comparing totals. Look for tear-off, disposal, delivery, protection of landscaping and exterior surfaces, magnetic nail cleanup, permits, taxes, and any charge for steep access, multiple stories, or special equipment.

| Situation | Information the proposal should establish first | |---|---| | Active leak | Likely entry point, temporary protection, repair limits, and what happens if hidden damage is found | | Storm damage | Photo documentation, damaged components, insurance-related scope, and repair versus replacement options | | Aging shingle roof | Remaining condition, decking risk, ventilation needs, full replacement materials, and warranty coverage | | Commercial flat or metal roof | Membrane or panel condition, drainage, penetrations, access plan, occupied-building protections, and sequencing |

The least expensive proposal may be the better value if it covers the same work with comparable materials and accountable installation. It may also be missing critical details. The paperwork should make that distinction visible.

8. Insurance language is accurate and pressure-free

If storm damage may support an insurance claim, the contractor can provide photos, measurements, and a written scope to help you understand the condition of the roof. A contractor may also meet with an adjuster to discuss documented damage.

Be careful with promises that an insurer will pay for everything or that a contractor can waive your deductible. Your policy, carrier decision, depreciation, deductible, and approved scope control the claim. A sound proposal separates insurance-related estimates from your contractual responsibility and explains any work that is not covered.

9. Warranty terms identify who stands behind what

Review both the manufacturer warranty and the contractor workmanship warranty. They cover different things. A manufacturer warranty generally concerns material defects, while a workmanship warranty addresses installation issues under the contractor’s stated terms.

Ask how long each warranty lasts, what registration is required, whether enhanced manufacturer coverage depends on using a credentialed installer, and what actions could affect coverage. Also confirm who you call if there is a concern after the job is complete. Local accountability matters more than a warranty document that is difficult to use.

10. Jobsite responsibilities and change orders are written down

The proposal should state who will supervise the project, expected working hours, estimated duration, payment schedule, and how change orders are approved. No contractor can control weather, but the plan should explain how the roof will be protected if rain interrupts work.

For homes, discuss driveway access, gates, pets, landscaping, outdoor furniture, and power needs. For commercial properties, confirm tenant notices, customer access, safety controls, delivery staging, after-hours restrictions, and protection of inventory or sensitive operations.

Do not rely on a verbal change order. If added work becomes necessary, get the condition, cost, and revised scope in writing before authorizing it whenever circumstances allow.

How to Compare Two Proposals Fairly

Put both proposals side by side and mark every difference in materials, tear-off, flashing, decking allowances, ventilation, drainage, cleanup, warranties, and exclusions. If one scope is shorter, that does not automatically make it wrong. It may reflect a different repair strategy, a different material system, or an item the contractor believes can remain in place.

Ask each contractor the same direct question: “What conditions could change the final price, and how will you document them?” The answer often tells you more than the initial price. A contractor who explains limits, shows evidence, and puts responsibilities in writing is giving you a basis for an informed decision.

Sure Claim Roofing approaches proposals from the inspection forward: document the roof condition, explain the available repair or replacement options, and give the owner a written scope to review before work is authorized.

A proposal should leave you with fewer assumptions, not more. If a line item is unclear, ask for it in writing before the first shingle is removed or the first membrane seam is opened.

See What Your Roof Should Cost in About a Minute

Type your address, and we measure your roof from satellite imagery and show you a real price range. Know your number before you talk to your insurance company.

Free. No obligation. Your price appears instantly online.

See your roof price in 60 seconds

Type your address. We measure your roof from satellite imagery and show you a real price range. Free, and no salesman visit required.

Prefer to talk to a person? Book a free inspection